Tired of ads? Subscribers enjoy a distraction-free reading experience.
Click here to subscribe today or Login.

Saturday, March 15, 2003     Page: 2A

APRIL 13 IS the deadline to file comments about Universal Electric Power’s
application for a preliminary permit to study the possibility of building a
hydroelectric plant near Francis E. Walter Dam on the Lehigh River. The date
was incorrect in a story Friday on Page 1B. Comments may be e-mailed to the
commission at www.ferc.gov or mailed to The Secretary, Federal Energy
Regulatory Commission, 888 First St., N.E., Washington D.C. 20426. Mailed
comments should include an original and eight copies. The filing should
include the word “COMMENTS” in capital letters.